ANALISIS RENCANA ANGGARAN BIAYA BANGUNAN CAMPING GROUND SEMBALUAN KABUPATEN LOMBOK TIMUR
Keywords:
Cost Budget Plan (RAB), Indonesian National Standard (SNI),Camping Ground.Abstract
The Cost Budget Plan (RAB) is a cost-planning document prepared based on the design and specifications for the construction work. In the construction of the camping ground in the Sembalun tourist area, the RAB is used to estimate the cost requirements before the project begins. As a potential tourist area, proper cost planning is needed to support facility development and encourage economic, social, and environmental development. The preparation of the RAB is in accordance with the Indonesian National Standard (SNI) and the Minister of PUPR Regulation No. 08/PRT/M/2023 concerning the analysis of work unit prices. Because it is prepared before implementation, the RAB is still an estimate. Based on the SNI method analysis, the total cost of building the camping ground is IDR 1,125,400,000 (one billion one hundred twenty-five million four hundred thousand rupiah).
Downloads
References
Deddy, Dԝi Rakhmanto, Fadiladitya A Soekisԝ, Hari Setijo Pudjihardjo, and Bambang Tutuko. 2021. “Perhitungan Rencana Anggaran Biaya Dan Proses Tender Design & Build.” Jurnal Teknik Sipil.
Haryanto, Hery, and Muhammad Sarjan. 2025. “Kajian Pengembangan Kawasan Agrowisata Sembalun Yang Berkelanjutan Berbasis Manajemen Tanaman Sehat Dari Perspektif Ontologi.” Journal of Multidisciplinary Science and Natural Resource Management 1(1): 1–7. doi:10.000/ISSN.
Kurniati, Rizki, Danang Pujo Broto, Sumintarsih, and Ginanjar Nugraheningsih. 2025. “Integrasi Aktivitas Fisik Outdoor Pada Destinasi Camping Ground.” Indonesian Journal of Sport and Tourism 7: 13–24.
Marcelin, Virginia, Mokolensang Tisano, Tj Arsjad, and Grace Y Malingkas. 2021. “Analisis Rencana Anggaran Biaya Pada Proyek Pembangunan Rumah Susun Papua 1 Di Distrik Muara Tami Kota Jayapura Provinsi Papua.” Jurnal Sipil Statik 9(4): 619–24.
Nawangsari, Dyanita, Chatarina Muryani, and Rahning Utomowati. 2018. “Pengembangan Wisata Pantai Desa Watu Karung Dan Desa Sendang Kabupaten Pactan Tahun 2017.” Jurnal GeoEco 4: 31–40.
Patty, Marvin Patrick, Pieter Lourens Frans, and Willem Gaspersz. 2024. “Tinjauan Perhitungan RAB Pembangunan Gedung Berdasarkan Permen Pupr No. 1 Tahun 2022.” Menara: Jurnal Teknik Sipil 19(1): 89–100.
Peraturan Mentri PUPR NO : 08/PRT/M/2023. 2023. “Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum Dan Perumahan Rakyat.” Kementrian PUPR: 1–18.
Siburian, David, Wita Kritiana, and Veronika Happy. 2022. “Analisis Perbandingan Estimasi Biaya Menggunakan Metode Sni 2017 Dan Ahsp 2016 (Studi Kasus : Proyek Pembangunan Gedung Kuliah Terpadu Universitas Palangka Raya).” Jurnal Ilmiah Teknik Sipil TRANSUKMA 4(2): 138–43. doi:10.36277/transukma.v4i2.105.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Nur Mujahadah Mujahadah, Agum Muladi, Lara Fiana

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.